The SCAR95 GPS campaign: objectives, data analysis and final solution Dietrich, R.; Heck, B.; Kutterer, H.; Lindner, K.; Mayer, M.; Pohl, M.; Seeber, G.; et al. 1997. In: The Geodetic Antarctic Project GAP95 - German contributions to the SCAR95 epoch campaign. Ed.: R. Dietrich. München 1996. S. 9-14. (Deutsche Geodätische Kommission bei der Bayerischen Akademie der Wissenschaften. Reihe B, H. 304.)
Data-based averaging Genda, A.; Fidlin, A.; Kummer, C. 2024, August 27. 26th International Congress of Theoretical and Applied Mechanics (ICTAM 2024 2024), Daegu, South Korea, August 25–30, 2024
Strain tuning in microstructured quantum materials F Henßler, F.; Putzke, C.; Khim, S.; Mackenzie, A. P.; Moll, P. J. W.; Tacon, M. L. 2024, September 18. 4th FIT4NANO Workshop (2024), Durrës, Albania, September 16–20, 2024
Deductive Stability Proofs for Ordinary Differential Equations Tan, Y. K.; Platzer, A. 2021. Tools and Algorithms for the Construction and Analysis of Systems – 27th International Conference, TACAS 2021, Held as Part of the European Joint Conferences on Theory and Practice of Software, ETAPS 2021, Luxembourg City, Luxembourg, March 27 – April 1, 2021, Proceedings, Part II. Ed.: J. Groote, 181–199, Springer International Publishing. doi:10.1007/978-3-030-72013-1_10
Anthropozän - helle und dunkle Seiten Grunwald, A. 2024. Zukunft des Menschlichen : Was wird … Mensch. 1000 Jahre Abtei Brauweiler (2024), Pulheim, Germany, September 14, 2024
Metadata Management in practice using MatWerk tools Chelbi, S. 2024, September 11. National Research Data Infrastructure for Materials Science and Engineering: NFDI-MatWerk Summer School (2024), Bremen, Germany, September 10–12, 2024
Nachwuchs-Forum "Gemeinsam Gestalten" Krüger, S.; Wursthorn, K.; Jäger, M. A.; Rabold, J.; Mayer, M. 2024. Mitteilungen und Veröffentlichungen aus den Themenbereichen Geodäsie, Geoinformation und Landmanagement, 72 (2), 68–71
Project Planning and Controlling Mucks, L.; Ruprecht, R. 2024, September 12. cStart Design Review Committee Meeting (DRC 2024), Karlsruher Institut für Technologie, September 11–12, 2024
Timing System Smale, N. J. 2024, September 12. cStart Design Review Committee Meeting (DRC 2024), Karlsruher Institut für Technologie, September 11–12, 2024
Control System Blomley, E. 2024, September 12. cStart Design Review Committee Meeting (DRC 2024), Karlsruher Institut für Technologie, September 11–12, 2024
Diagnostics for Operation El Khechen, D. 2024, September 12. cStart Design Review Committee Meeting (DRC 2024), Karlsruher Institut für Technologie, September 11–12, 2024
Support Structure & Girder Borkowski, T. 2024, September 12. cStart Design Review Committee Meeting (DRC 2024), Karlsruher Institut für Technologie, September 11–12, 2024
RF System for VLA-cSR Mochihashi, A. 2024, September 12. cStart Design Review Committee Meeting (DRC 2024), Karlsruher Institut für Technologie, September 11–12, 2024
Injection into the VLA-cSR Steinmann, J. L. 2024, September 12. cStart Design Review Committee Meeting (DRC 2024), Karlsruher Institut für Technologie, September 11–12, 2024
Magnets of Injection Line and VLA-cSR Bernhard, A. 2024, September 11. cStart Design Review Committee Meeting (DRC 2024), Karlsruher Institut für Technologie, September 11–12, 2024
FLUTE Injector & Injection Line to the VLA-cSR Härer, B. 2024, September 11. cStart Design Review Committee Meeting (DRC 2024), Karlsruher Institut für Technologie, September 11–12, 2024
Longitudinal Beam Dynamics in the VLA-cSR Schwarz, M. 2024, September 11. cStart Design Review Committee Meeting (DRC 2024), Karlsruher Institut für Technologie, September 11–12, 2024